Autoscaled rollout policy utilizes the cluster autoscaler
during blue-green upgrade to scale both the blue and green
pools.
Attribute
Name
Description
wait_for_drain_duration
google.protobuf.duration_pb2.Duration
Optional. Time to wait after cordoning the
blue pool before draining the nodes. Defaults to
3 days. The value can be set between 0 and 7
days, inclusive.
[[["Easy to understand","easyToUnderstand","thumb-up"],["Solved my problem","solvedMyProblem","thumb-up"],["Other","otherUp","thumb-up"]],[["Missing the information I need","missingTheInformationINeed","thumb-down"],["Too complicated / too many steps","tooComplicatedTooManySteps","thumb-down"],["Out of date","outOfDate","thumb-down"],["Samples / code issue","samplesCodeIssue","thumb-down"],["Other","otherDown","thumb-down"]],["Last updated 2026-06-03 UTC."],[],[]]